Delhi CM inspects Sriniwaspuri road stretch redesigning


On Tuesday night, Chief Minister Arvind Kejriwal inspected Sriniwaspuri, Ring Road, one of many seven street stretches that have been a part of the pilot venture for redesigning 540 km of roads alongside the traces of European cities. The venture is anticipated to be accomplished by 2023.

Kejriwal reviewed the redesign work of the roads that have been taken up beneath the pilot venture. “The process of designing the roads should be done in a swift manner, and it should be completed within the stipulated deadline, i.e., by 2023. The PWD should ensure the removal of all obstacles. The tender process and other formalities should be completed as soon as possible for rapid completion of the project.”

Officials stated work on the pilot venture is progressing quickly. In the assembly, the CM assessed the work on all of the stretches beneath the pilot venture. In whole, the pilot venture covers 35 km.

The redevelopment of a 5.5-km-long street from Ring Road to Ashram has been accomplished. Work on a 6-km stretch from Wazirpur Depot Crossing to Rithala Metro Station, and on a 5.2-km stretch from Britannia Chowk to Outer Ring Road, is ongoing. Similarly, beautification work on a 3.1-km-long street from Shiv Das Puri Marg to Patel Road, Moti Nagar T-Point to Pusa Road, and Laxmi Nagar to Karkari Mor on Vikas Marg is underway.

Redesigning the roads will eradicate bottlenecks and improve inexperienced cowl.



Source hyperlink

Related Articles

BEST DEALS

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles